Weekly Team Update
As the semester is wrapping up, the Full-Scale Mounting team is finishing up their work while directing their energy to the Final Paper for ME 195a.
The team will be finishing loose ends on several topics related to
1. Finalizing the velcro being used.
2. Cleaning up the Ansys simulation of the load
3. Condensing the final design down to a half model and flipping it opposite to have a East-West facing frame construction.
4. Cost Analysis and Bill Of Materials
With these tasks in mind, the team is looking to be wrapped up for the semester after the paper. Time will be devoted over the break to brainstorm more ideas that have not been address yet.
12/3-12/7
The team will be finishing loose ends on several topics related to
1. Finalizing the velcro being used.
2. Cleaning up the Ansys simulation of the load
3. Condensing the final design down to a half model and flipping it opposite to have a East-West facing frame construction.
4. Cost Analysis and Bill Of Materials
With these tasks in mind, the team is looking to be wrapped up for the semester after the paper. Time will be devoted over the break to brainstorm more ideas that have not been address yet.
12/3-12/7